As below pictures show, our dredge operation is up and running as of June 3. As these pictures and captions also show, this operation is a sophisticated process. We are very happy with how remarkably clean the water is in the end result. This staging process was designed by Warger Engineering, built in a 2 phase construction was by Selby Construction & VVA staff, and made possible by VVA members who provided strong support for this.

The dredging season began June 6.

